The reroofing process largely depends on the size and complexity of the roof and also the weather.
Typically an average sized residential roof can take up to three weeks to complete the entire process, including installation and removal of site safety equipment.
For more info on the reroofing process, click here.
Yes, in most cases we can take care of this for you.
No, we plan the process carefully and complete sections of your roof at a time to ensure it is left water-proof at the end of each day.
Yes, you are able to continue to live in your home while we undertake the work.
Please note:
Yes, we provide scaffolding, fall protection or anchor points and harness as the situation requires.
In most cases, the scaffold or fall protection will be designed for the purpose of completing the roof and won’t suitable for other work.
Please let us know if you would like to utilise the scaffolding for other work, so we can allow for this in our quotation and have it installed to suit your requirements.
Looking after our environment is important to us. We do what we can to recycle all discarded roofing materials.
Talk to us if you wish to keep the old roofing material so we can organise for it to be left tidily on site.
The steel comes with a manufacturers warranty ranging from 15-25 years depending on your selected product and environmental conditions.
We provide an 8 year “No Worries” Workmanship Warranty. Terms and conditions apply, a copy of these can be provided upon request.
Yes, in most cases insulation can be installed.
Please let us know if you would like this to be included in your quotation.
Yes, we are a primary member of the Roofing Association of New Zealand (RANZ).
If any unforeseen rotten timber is found, we will contact you to discuss an appropriate repair strategy.
Yes, please let us know if you would like us to include this in your quote.
When inspecting your roof if we find that your spouting is in poor condition, we will let you know and recommend a replacement.
Our customer support team will keep you up to date with the progress of your roof.
We will complete a full site safety analysis, arrange for powerlines to be wrapped and fall protection to be installed where required to complete your Re-Roof.
The material manufactured specifically for your roof will be delivered to site.
Your old roof will be removed and replaced with new iron one face at a time by licensed Roof Doctor technicians.
Final flashings will be measured and ordered. When ready, these will be collected and installed.
Once we have completed your Re roof, your site will be left clean and tidy followed by the removal of all site safety equipment.
On completion of your final quality check sign-off we will send you your warranty documentation.